‹ All calculators
Free calculator
Concrete calculator
The concrete for a slab or a foundation, in cubic metres and cubic yards, with the formwork and the materials under the slab.
How it's calculated
- Slab concrete = length × width × thickness, + waste.
- Footing concrete = wall length × footing width × footing thickness, + waste. Wall concrete = length × height × wall thickness, + waste.
- Formwork: footing = length × thickness × 2 sides; wall = length × height × 2 faces.
- Under the slab: rigid insulation = area; polyethylene and wire mesh = area + 10% overlap.
- 1 cubic yard (cu. yd) = 0.7646 m³.
Measure once. The rest follows.
In KOR, this calculation happens on its own from your plans: measure the foundation or the slab once, and the concrete, formwork, rebar, anchor bolts and drain follow.
Try free for 14 days14-day free trial, no credit card.